Currently under
development at GTI, the document management
system PharAO® has been custom designed
for the specific requirements of the pharmaceutical
and other regulated industries. The roll-out
for the first version of the software is
scheduled for September of 2004. PharAO® is
the result of a close cooperation with Saperion
AG, one of the leading manufacturers
of DMS solutions.
PharAO® comes with a range of add-on
options, and includes all standard DMS functionalities,
such as the copying of scanned documents,
extensive indexing options, and easy document
research, copying documents directly from
MS Office, automatic version management of
document changes, read-only, long term archiving,
configurable workflows, a differentiated
rights system, etc.
PharAO® will already contain complete
document templates for the validation of
computer aided systems (e.g., SOPs, validation
master plan, risk analysis, DQ, IQ, OQ, PQ,
validation report), plus industry-specific
pre-configured workflows. Moreover, the system
is intended to include a dossier management
according to the eCTD standard. As a pharmaceutically
qualified system, PharAO® is naturally
GMP compliant according to all relevant EU
and FDA guidelines, and thus fully validation-enabled.
Users of the PPS / MES
solution Scarabaeus+ will
be able to use PharAO® as integrated
add-on option. Each report generated in
Scarabaeus+ can automatically be archived
in read-only form. The indexing is fully
automated so that invoices are assigned
to the proper customers, purchase orders
to the proper vendors, and analytical protocols
to the proper batches. Document research
is equally smooth: With a single mouse
click you retrieve, for instance, all documents
archived for a batch you selected in Scarabaeus+.
Scarabaeus Release 05.00.0007:
LIMS Functionalities Now to Include Single Sample Management
|
|
top
There are still a few openings in our workshop “Production
Planning Using MS Project” in conjunction
with the 2nd Scarabaeus Conference that is
scheduled for September 24 in Kleinmachnow
near Berlin! The registration fee is € 165,-
per attendee.
Workshop Profile: A high number of production
orders to be processed usually results in a
number of conflicts in regard to resource availability
and delivery dates, as well as bottlenecks
in terms of required components. These are
problems that need to be solved, while manufacturing
tasks must be sequenced according to confirmed
delivery dates. This includes, for instance,
the logical production sequence from semi-finished
to finished products. On the one hand, Microsoft
Project visualizes any obstacle to a smooth
production that may result from the present
data status. On the other hand, it provides
the option to optimize the utilization of the
required resources (facilities, equipment,
staff). The next step allows you to recalculate
the earliest possible production date. What-if
scenarios or cost calculations are examples
for multiple other options provided by MS Project
that could supplement your production planning
in a useful way. Click here to
request your registration forms.
|